Effective liaison, entailing full co-operation with clients, fellow contractors and staff, is a major NRL Rail strength.
It ensures that work is done safely, to budget and to deadline.
Project Management, SSOW packs, WWPs, Task Briefing Sheets and ATWs (Authority to Work Cards) are all elements of the company’s risk management process – an integral part of our professional approach.

* Installation, testing and maintenance testing of signalling equipment by IRSE licensed technicians
* Calibrated test equipment and tools provided. SIN actions, WPP’s and risk assessments
* Provision of SWTH testers with authorised Certificate of Competency
* Experienced workforce from a Renewals and Civils background
* Compilation of detailed S&T site surveys for clients prior to starting work
* Ability to carry out IRSE assessments
Ultrasonic Rail Flaw Detector Operatives (URFDO) supplied who are qualified to carry out all required tests upon Permanent Way UK-wide.
* Plain Line and S&C Renewals
* Stressing of CWR levels 1,2 & 3
* Tamping, TQS, Track Handback to 125mph
* Planning of works and worksite manpower and materials
* Surveys and setting out of worksites with Trimble Total Station qualified engineers
* All Technical Officer grades and Contractors Responsible Engineers (CRE)

Hand Grinding Teams for removal of GCC, re-profiling and Switch and Crossing O53/054 Inspections.
* Bridge maintenance
* Drainage, concrete and tarmac works
* Station upgrades and building works
* Access roads and pathways, fencing, troughing, safe CESS installation
* PTS Trades, for example bricklayers, electricians and painters
* Site and ecological surveys
* Small and large plant for felling, chipping and removal from site by qualified and experienced staff
* Weed control, spraying and removal
All work is carried out in accordance with the latest national and rail specifications.
Work carried out by NRL Rail was associated with the National S&C Grinding Programme.
We compiled surveys for our clients outlining the potential risks and hazards in a work zone from an S&T perspective.
NRL Rail supplied competent ‘U’ certificated technicians and equipped them with the industry approved walking sticks and ultrasonic sets.
NRL Rail contracted IRSE licensed supervisors and technicians to build and install 39 new point sets.
We supplied IRSE licensed S&T maintenance teams with test equipment, hand tools and vans. Coverage was nationwide.
Testing carried out pre- and post-installation by IRSE licensed technicians, sourced and supplied by NRL Rail.